November 2007 Progress Photos at the Nokes Boulevard Interchange


Delivery of 66" concrete pipe.



Installation of temporary traffic signal.



Asphalt paving SB Rt. 28.



Installation of 66" concrete pipe.



Drilling for bridge piles. 28.



Installation of underdrain.



Installation of bridge piles. 28.